PDO

Our Services Inside PDO

01

Flowline Construction

Our team handles sizes from 4" to 36" with precision and efficiency.

05

Excavation & Rock Breaking

Efficient excavation and controlled rock breaking for oilfield and construction sites. Using advanced machinery to minimize disruption and maximize productivity.

09

Trench Excavation

Accurate trenching for pipelines, cables, and utility installations. Meeting depth, slope, and safety requirements.

13

Windrow Construction

Organized pipeline preparation with proper windrow formation. Ensuring smooth installation and environmental compliance.

17

Sand Blasting

Surface preparation using controlled abrasive blasting techniques. Removes rust, paint, and contaminants for optimal coating adhesion.

02

Welding (4" to 36")

High-quality welding for pipelines and structures, meeting strict industry safety and quality codes.

06

Road Crossing Excavation & Backfilling

Specialized trenching and backfilling for safe pipeline road crossings. Ensuring long-term stability and minimal traffic disruption.

10

Painting

Industrial-grade protective coatings to extend equipment and structure life. Resistant to corrosion, weather, and operational wear.

14

Road Construction

Durable oilfield access roads for heavy equipment and transport. Built to withstand extreme operational conditions.

18

HDPE Fusion & Pulling

Professional fusion and pulling of HDPE pipelines for leak-free performance. Executed with specialized welding and handling equipment.

03

Cold Cutting

Safe, spark-free cold cutting solutions for pipelines in operational environments. Ideal for shutdowns and maintenance without heat risks.

07

Sleeper Installation

Precise installation of sleepers for pipeline support and stability. Built to withstand heavy loads and harsh environments.

11

PCC (Plain Cement Concrete)

High-strength PCC works for foundations, floors, and structural support. Mixed and poured to precise engineering specifications.

15

Flowline Flushing

Complete cleaning of flowlines to remove debris and ensure smooth operation. Performed with high-pressure and safety-controlled methods.

19

Electric Pole Demolition

Safe removal of electrical poles in active work zones. Following PDO safety protocols and environmental guidelines.

04

Drilling Rig Location

Complete site preparation for drilling rigs, including grading and compacting. Designed for stability, safety, and operational efficiency.

08

Foundation Installation

Strong, engineered foundations for oilfield equipment and infrastructure. Built to last under demanding site conditions.

12

Sand Screening

Clean, graded sand supply for backfilling, bedding, and construction works. Processed to meet project-specific standards.

16

Beam Pump Dismantling

Safe dismantling of beam pump units for repair, relocation, or disposal. Minimizing downtime and preserving reusable components.

20

Oil Sampling

Accurate oil sampling for quality analysis and performance monitoring. Performed using industry-standard methods and equipment.

Get Free Quote

Have a project in mind?